Hereford Voice Posted Monday at 12:59 Report Posted Monday at 12:59 Hereford Voice were kindly invited to a preview of the progress at The Pavilion and the superb work by Aspire Building Contractors and Errand Studio We are so looking forward to seeing the completed regeneration of this historic Pavilion building as part of StrongerHereford. The project is scheduled to be completed week commencing 8th August 2025 (subject to change). There is disabled access with 2 interior lifts, one of which will take people to the roof terrace. There are toilets and separate disable toilets. ed1e2027079a75cb760ba8f61d6614ec.mp4 Part 2 👇 11cb2e19c62de73b0de2be21e366aaa0.mp4 Thank you to Katie Bott for kindly showing us around. Quote
Hereford Voice Posted Monday at 13:19 Author Report Posted Monday at 13:19 Continued.. Two venue rooms are available for hire. Top Floor - The Artist Room The Artist Room.MOV Quote
Hereford Voice Posted Monday at 13:27 Author Report Posted Monday at 13:27 The River Room The River Room.MOV Quote
Hereford Voice Posted Monday at 13:56 Author Report Posted Monday at 13:56 Roof Terrace There are safety railings to still be installed around the perimeter. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.